At a packing station in Sweden, a workplace inspection (skyddsrond) finds that staff repeatedly twist to reach the cartons they use most often. The supervisor can make a temporary change today. A permanent change to the work surface needs more time. The action plan records who will see that it happens and when it is due. The follow-up records whether the change reduced the twisting during normal work.
What goes into the written plan in Sweden?
Under section 13 of the Swedish Work Environment Authority’s AFS 2023:1 (in Swedish), employers must take the necessary measures immediately or as soon as practicable. Measures that cannot be carried out immediately must be recorded in a written action plan. For each measure, state when it is due and who will make sure it is carried out. The employer must check measures after they are implemented. The authority’s guide to systematic work environment management (SAM, in Swedish) includes blank forms and explains the written-plan requirement regardless of headcount.
Add a reference to the risk assessment so the person checking the result can see what the measure was supposed to change. Set any immediate precautions according to the actual risk. Start from the employer’s assessment and involve the people who do the work. A date in a plan does not make an unsafe situation acceptable until that date.
A completed action entry from a packing room
This fictional entry is an example of how to document the follow-up. Adjust the measure and the checks to your own assessment.
| Field | Example entry |
|---|---|
| Finding and source | SAM-07. Inspection and risk assessment, 10 November 2026. Staff at station 2 repeatedly turn to reach frequently used cartons behind them. |
| Measure and temporary arrangement | Move frequently used cartons into the assessed reach area. The supervisor arranges a temporary supply position with the packing team the same day and checks that it leaves the aisle clear. |
| Responsible person and deadline | Elin, packing supervisor, to see that the permanent arrangement is in place by 16 November 2026. |
| Work done | 16 November: new shelf in place. Elin records what moved and where. |
| Check and decision | 17 November: the supervisor and safety representative observe a normal packing run. Staff still twist for the largest cartons, so the action stays open. Elin agrees a further change and a new check for 19 November. On 19 November the team observes normal work with both carton sizes, confirms the repeated turn has been removed for those tasks, checks that the aisle is clear and records the result before closing SAM-07. |
When you copy this layout, leave the completion and check fields blank until each event happens. If a check fails, keep its result and record who will make the next change and when it will be checked. Keep the original deadline and note any revised commitment with its reason.
Keep the assessment and follow-up together in Folderit
If your team uses a shared written plan, store the working document beside the inspection and risk assessment in a folder for the people who need access. Give the entry a stable reference such as SAM-07. Use Related Items to connect separate documents. Open the saved link from a colleague’s account to confirm they can read the supporting document.
If your account includes eForms, you can keep one searchable record per action. In the form template, use text for the reference, long text for the observation, measure and inspection result, a User field for the person responsible, Date fields for the due and check dates, and a Select field for stages such as Open, Ready to check and Closed. Set the destination folder. Give the people who will update a record the necessary Editor permission on that item or folder. Check the current Folderit plan details for forms availability.
When the shelf is installed, Elin opens the record, chooses Modify, records the work and marks it Ready to check. After the first check she records the finding and returns it to Open. She adds the second check result before choosing Closed. These are manual updates in a proposed setup. Put the responsible person, due date and stage in the folder view so the next reviewer can find open work without opening every record.